- Wszystkie wirówki
- Wirówki stołowe
- Wirówka stojąca na podłodze
- Wirówki z chłodzeniem
- Mikrowirówki
- wirówki wielofunkcyjne
- Wirówki wysokoobrotowe
- Ultrawirówki
- Koncentrator
- IVD Products
- High-Speed and Ultracentrifuge Consumables
- Probówki wirówkowe
- Płytki wirówkowe
- Zarządzanie urządzeniem
- Zarządzanie próbkami i informacjami
-
- Wszystkie pipety, dozowniki i stacje robocze do automatycznej obsługi cieczy
- Pipety mechaniczne
- Pipety elektroniczne
- Pipety wielokanałowe
- Pipety i dozowniki wyporowe
- Końcówki
- Dozowniki butelkowe
- Pipetory
- Akcesoria do dozowników i pipet
- Automatyczne pipetowanie
- Materiały zużywalne do automatyzacji
- Akcesoria do automatyzacji
- Usługi związane z dozownikami i pipetami
Where do we get our power from?
So we take advantage of every opportunity to reduce the amount of energy we purchase. This is also why measures to improve energy efficiency and
Green electric energy
Thermal power station
Geothermal power
Re-use of heat
Green electric energy
Warto przeczytać
Certificates
Geothermal power
A good example is a dedicated office building at our company‘s main location in Hamburg, Germany. In 2013, we evaluated, planned and finally implemented the utilization of the site‘s existing geothermal energy for heating and cooling the entire building. Since 2014, the heat pumps required by the geothermic plant are no longer supplied with external electrical power, but with solar power generated by the system on the roof of the building. Although it is occasionally necessary to use externally sourced electrical power at night, the building has a nearly even energy balance.
This construction project posed a number of special challenges. For example, before the geothermal plant was built, the anticipated heating
Eppendorf‘s extensive test drilling and the insights it gained from the use of different types of probes and drilling depths were pioneering efforts in the region.
We were well aware of the uncertainties of such a project, but it was a challenge we enjoyed meeting, and our efforts were rewarded by the energy selfsufficiency of the building, the valuable insights we gained into the use of geothermic systems in the region, and the concrete contribution the project enabled us to make to the goal of environmentally friendly energy supply.
Re-use of heat
The Eppendorf ULT freezer manufacturing process includes several quality checks. Each ULT freezer is thoroughly inspected to meet the rigorous quality guidelines. The final inspection takes more than 24 h and is based on a real test run of the unit down to -80 °C. This process is documented by an individual Certificate of Quality, complete with serial number, provided as standard for your documentation. The compressors consume energy to cool the ULT freezer at -80 °C but also generate heat. The freezer manufacturing facility takes advantage of this: The heat output during final individual unit testing discharges into the building heating system.